Removal of 980mm diameter Piles under water for the new Gateway Bridge, Brisbane.

Cutrite was contracted to cut and remove 4 x 980mm diameter piles with 16mm steel casing. These pillions were installed during construction of the new Gateway Bridge to support the tower crane. The cut line was approximately 2.5 meters below water level and once the saw was set up each cut took approximately 2 hours.